Welcome to Marshfield


Greetings from Wisconsin. We arrived on June 25, 2002

Go to the Finished House

Upon arrival in marshfield we took up residence at the Key Apartments, where the nice managers made us feel right at home.
Vivian her cats relaxing after a long trip from california the day before.
A picture of the Marsh across the road from the land we are having a house built on
more views of the marsh
Even another view of the marsh
The Marshfield Clinic
View of St. Joseph's Hospital
A picture of the foundation of our house
A veiw of our basement with the finished slab
Another view of the basement
The wood going to be used to construct our house arrived on the site
Kimba & Sondi waiting for the house to be built
Picture of the basement with the metal beams in place
Another view of the beams in place
First step in basement windows
First picture of house with framed walls

6Aug2002

Another view of framed house

6Aug2002

View of the side of the house

6Aug2002

Pictures of the inside framing of the house

6Aug2002

Inside house framed for the great room

6Aug2002

View of house with roof framed

8Aug2002

Another view of the roof framing

8Aug2002

yet another view of house with roof framed

10Aug2002

Even another view of the roof framing

10Aug2002

View of framed garage

11Aug2002

Picture of the work shop

11Aug2002

View of framed kitchen

11Aug2002

Picture of the Great Room

11Aug2002

View of framed master bedroom

11Aug2002

Future Location of the "PowerFlush Toilet"

11Aug2002

View of framed second bedroom

11Aug2002

Picture of the office

11Aug2002

View out the front door

11Aug2002

View from Bedroom window

11Aug2002

The last pieces of the roof are going in

14Aug2002

Brick starting to go up on the corner of the house

14Aug2002

Front brick work finished

16Aug2002

Another picture of finished front brick

16Aug2002

Picture of the greatroom area

16Aug2002

vivian in kitchen area

16Aug2002

Master bath shower

16Aug2002

Soaking Tub in Master Bath, with Vivian in the picture

14Aug2002

Tub for second bathroom

16Aug2002

picture of fireplace

16Aug2002

Back door in the house

16Aug2002

skylight

16Aug2002

Vivian in Kitchen area

16Aug2002

Vivian standing in garage

16Aug2002

Finished roof

16Aug2002

Another picture of the finished roof

16Aug2002

Front Brick finished

18Aug2002

Drywall started

22Aug2002

Celing of greatroom with drywall

22Aug2002

The siding is finshed on the house

22Aug2002

kitchen cabinets with Vivian in the picure

14Oct2002

More kitchen cabinet picts
Picture of Fireplace

14Oct2002

Hallway
picture of tub with tile

14Oct2002

House Completed 1 Nov 2002

The Finished Kitchen
Another shot of the finished kitchen
Shot of main hallway
The hottub replacement, a soaking tub
The World famous powerflush toilet and the shower
Shot of the finished fireplace

Thanks for browsing my page.

Last Updated: 1 Nov, 2002.
Return to Vivian's Neighborhood